Crabtree Northbank Interceptor Emergency Replacement
Owner
Project Type
Size
Length
Project Overview
CJS provided engineering plans and specifications and assisted in bidding the replacement of approximately 8,200 LF of existing 54-inch gravity sewer along the north bank of Crabtree Creek from Marsh Creek to an existing inverted siphon near the Crabtree Lift Station. This project was designated as an emergency replacement by the City and CJS prepared and bid the project within 4 weeks to allow the construction to begin in an expeditious manner. CJS is also preparing record drawings for the project.