CJS provided engineering plans and specifications and assisted in bidding the replacement of approximately 8,200 LF of existing 54-inch gravity sewer along the north bank of Crabtree Creek from Marsh Creek to an existing inverted siphon near the Crabtree Lift Station. This project was designated as an emergency replacement by the City and CJS prepared […]

Projects

The City plans to construct approximately 16,500 LF of 36-inch transmission main generally between the Pullen Park Pump Station and the E.B. Bain Pump Station to reinforce the 495 and 595 pressure zones. The project will include preliminary evaluations, design, easement mapping, permitting, bidding phase assistance, and construction phase services. The preliminary evaluations phase will […]

Projects

CJS Conveyance provided construction observation services for the Town of Cary Walker Street Improvements project. The project consisted of improvements to the roadway, sidewalk, traffic signals, and utilities in the heart of downtown Cary. A major component of the project consisted of upgrades to the water, sanitary sewer, and stormwater systems. A 16-inch DIP water […]

Projects

This project consists of approximately 11,000 LF of new 12-inch water main along NCDOT right-of-way and a new 525 gpm water booster pump station for the Elevation Water District in Johnston County. The project is part of a series of water system improvements to provide the necessary water supply to the western region of the […]

Projects

CJS Conveyance routinely provides water modeling for development sites to determine available fire flow. Developments have incliuded multi-family sprinklered buildings, restaurants, and office buildings.

Projects

The project includes the relocation of approximately 450 LF of 12-inch water line between Poplar Pike Land and Grey Marble Road along Louis Stephens Drive. The water line requires relocation to avoid conflict with the proposed roadway improvements associated with the NCDOT Louis Stephens Drive Extension (U-5827) Project. CJS is working as the Town’s engineer […]

Projects

CJS providing preliminary engineering evaluations for the replacement of an existing aerial 12-inch water main along Marine Boulevard on the south side of the bridge at Chaney Creek. The evaluations included structural assessments of existing aerial supports, wetland delineations, geotechnical investigations, alternative analyses, construction cost opinions, and preliminary trenchless and aerial crossing designs.

Projects

CJS provided temporary project management assistance for OWASA for several months while OWASA advertised, interviewed, and evaluated engineering candidates for open poisitions within the water department. CJS member Jeremy Rivenbark, PE worked directly with OWASA staff at their office in Carborro, where he helped manage utility projects and coordinate with the other engineers in the […]

Projects

The Town of Fuquay-Varina identified main replacements for eight locations for water main replacements for the 2020 calendar year. These locations included the heavily traveled Academy and Main Streets, outlying NCDOT roadways such as Holland Road, and various residential streets near the downtown area. The project included the design of replacement mains predominantly within the […]

Projects

A complex urban utility replacement project including initial studies, public outreach, design, and construction phase services for replacement of approximately 5,600 LF of water main in W. Main Street and 5,700 LF of water main in N. Elizabeth Street in Downtown Durham.  With the water main replacements, the evaluations and designs will also include sanitary […]