Pullen to Bain Water Transmission Main

Raleigh, NC

Owner

City of Raleigh Public Utilities Department

Project Type

Water

Size

36"

Length

16,500'

Project Overview

The City plans to construct approximately 16,500 LF of 36-inch transmission main generally between the Pullen Park Pump Station and the E.B. Bain Pump Station to reinforce the 495 and 595 pressure zones. The project will include preliminary evaluations, design, easement mapping, permitting, bidding phase assistance, and construction phase services. The preliminary evaluations phase will include pipeline route analyses (including potential reuse main), pipe material evaluations, review of necessary permits and easements, and development of preliminary construction cost opinions. Based upon the findings of the preliminary evaluations and reporting a design plan will be implemented.